Project directory
A project directory provides details of the organisations involved in a design and construction project. This may include their role, organisation name, address, phone numbers, email addresses and names of key contacts.
This is an important document that should be established as soon as appointments are made, and will develop as the project progresses and there are new appointments.
In the first instance, a project directory might be included in the project brief and may contain blanks were appointments have still to be made. As it develops it may go on to form a part of, or be referenced in; the project execution plan, pre-construction information, the construction phase plan, the contractor’s project handbook and so on.
At different stages of the project it may include details project team members including the:
- Client.
- Project manager / employers representative / employers agent.
- Principal designer.
- Consultant team
- Principal contractor.
- Subcontractors.
- Suppliers.
It may also include specific details of the roles and responsibilities of the site team, such as security operatives, health and safety officer and so on, and might include details for neighbours and key stakeholders.
It is important that the project directory is kept up to date, that responsibility for its preparation is allocated to a specific individual and that there is strict control of its distribution. Clearly without proper control and procedures in place, there is a danger that there will be different versions of the project directory and that confusion will occur, particularly, for example if one organisation, such as the contractor develops their own project directory, as their requirements may be different from those of the client or consultants.
The Construction (Design and Management) Regulations (CDM Regulations) 2015 require that the construction phase plan includes “details of key members of the project team”. The 2007 regulations required that pre-construction information included “details of client, designers, CDM co-ordinator (no longer required) and other consultants”, and whilst this is not a specific requirement of CDM 2015, it is difficult to see how duty holders could properly perform their duties without access to information identifying key project team members.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
The continued ISG fall out, where to go?
Support for ISG contractors, companies and employees.
New HES national centre for traditional building retrofit
Announced as HES publishes survey results which reveal strong support for retrofit.
Retrofit of Buildings, a CIOB Technical Publication
Expected to become one of the largest activities in the global construction industry.
The ECA industry focus video channel
Keeping update with the industry session by session.
Over 25 recorded informations sessions freely available.
AT Awards 2024 ceremony East London October 25th.
Revisiting the AT community at the 2023 awards evening.
The Community Housing Fund and built affordable homes
CLTN reviews the impact of the Fund and calls for extension.
The grading system of the Regulator for Social Housing
A background, an explanation and ten recent enforcements.
Construction, repair and maintenance. Book review.
Putting new life into a city with a 1900 year history.
BSRIA Briefing 2024: Sustainable Futures speakers
Redefining Retrofit for Net Zero Living 22 Nov.
Wall of support for post-Grenfell regulation of electricians
Call for a shake-up of the construction industry highlighted on radio.
Digital sustainability through future AEC tools
Bringing together industry and academia to meet challenges.
Skills gap for net zero highlighted to Minister for Industry
ECA convenes roundtable discussion at Portcullis House.
Evidencing Net Zero with the new UK buildings standard
Pilot version with detailed excel proforma out now!
Scottish Building Safety Levy, in consultation
From direct remediation and the RPDT, to the costs and alternatives.
Waves of warmer homes grants for the rental sector
Boosting energy efficiency standards for all rented homes.
A refocus of the National Planning Policy Framework
Key terms described in brief, as the consultation closes the evening of the 24th.
Fortified farmhouses of the unruly 16th-and 17th-century borders.